Rondout – West Branch Tunnel Magnetic Leak Detection Investigation
The Replacement of the Existing Water Siphons Between Brooklyn and Staten Island
Environmental Assessment on Transshipment of Tallman Island Sludge and Bowery Bay Centrate
Proposed Storm Sewer Outfall Serving Edgemere Section of Queens
Proposed Rule Governing House/Site Connections to the Sewer System
Proposed Expansion of Boating at Cannonsville Reservoir
Bronx River Floatables Control Facilities
Gowanus Facilities Upgrade
Rules for the Protection from Contamination, Degradation and Pollution of the New York City Water Supply and its Sources
Gilboa Dam Reconstruction
Hillview Reservoir Cover Project
Hendrix Street Canal Interim Dredging
The Croton Filter Plant Project
Rules and Regulations for the Recreational Use of Water Supply Lands and Waters
New Croton Dam Road Closure Environmental Review
Removal of Sediment from the Shandaken Tunnel Intake Channel in Schoharie Reservoir
City Tunnel No. 3, Stage 2 Manhattan Leg Shaft 33B Project
The Catskill/Delaware Ultraviolet Light Disinfection Facility
The Waterfowl Management Program Final Environmental Impact Statement
Avenue V Pumping Station Environmental Assessment
Tallman Island Water Pollution Control Plant Upgrade Program
Hunts Point Water Pollution Control Plant Phase III Upgrade
Replacement of the Plum Brook Bridge "M"
Modification to City of New York Drought Emergency Rules
Hunts Point Water Pollution Control Plant Barretto Point Site Remediation
Rondout Borrow Pit Forest Management Project
Burns Cove Forest Management Project
Rondout-West Branch Tunnel and Shaft Rehabilitation Project
Kent Manor
Current: 91.0% Normal: 70.1%